Truck Loading Custody Transfer for Lubricant Products
The Client’s Tank Trucks Loading Area was upgraded to allow for the Custody Transfer of lubricant products being shipped to end clients. As part of
Multidiscipline
The Client’s Tank Trucks Loading Area was upgraded to allow for the Custody Transfer of lubricant products being shipped to end clients. As part of
The Client announced publicly in November 2012 that it had completed its investment in the Relay facility. Relay can now fill up to 300 bottles
TAI was tasked with the phased expansion of a 20,000 SF existing office space into a GMP manufacturing facility in Columbia, MD. The work included
A coatings and sealants manufacturing company located in Cinnaminson, NJ was looking to construct a new manufacturing facility in Camden, NJ. This company’s intention was
A chemical company which manufactures industrial inorganic chemicals planned to construct a new Brine Treatment Plant to double their manufacturing capacity at their Delaware City,
TAI provided mechanical HVAC, plumbing, electrical, process and fire protection engineering to provide utility code compliant design of ISO Class 5, 7, and 8 cleanrooms,
TAI installed new compressed air service and electric distribution; fixed exterior/interior walls with (FRP/paint/cove), installed new personnel and material entry doors and new flooring and
TAI provided engineering, procurement and construction for upgrading the process waste system at Client’s facility located in Frederick, MD. The Client decided to replace two
TAI is providing turnkey services and design-build solution for the replacement of outdated PLC equipment throughout the Client’s facility. TAI is implementing a plant-wide control