Food & Beverage > Page 2
The Client upgraded a 25-year-old PLC control system in the Edible Oil Refinery of their Soybean Processing Plant. The project involved the replacement of three
The Client completed the construction of its new Distillery in Baltimore, MD in April 2017. TAI provided the complete Project Management, Electrical, Instrumentation, Automation, and
TAI developed several services for the Client including preliminary engineering, automation and controls and inspection and test services and site-wide power system analysis. For the
TAI provided the initial feasibility study and the projecting scope for expansion for the storage of high proof spirits. TAI provided design and construction for
TAI worked at this facility for two different projects. The first project’s goal was to control humidity during and after cleaning procedures as well as
TAI provided architectural and engineering services to generate Issue for Bid documents for a 15,000 sqft GMP isolated manufacturing space for the Client’s facility in
TAI’s Specialty Construction Group (SCI) provided electrical field services for the Client’s flour expansion project located in Hazelton, PA. TAI-SCI supplied all labor and materials
"*" indicates required fields