New Structures for Horticulture Facilities
The Client’s project was to build a new facility to include a 1,500 sf pole barn and office trailer and needed engineering, design and documentation
Project > Page 7
The Client’s project was to build a new facility to include a 1,500 sf pole barn and office trailer and needed engineering, design and documentation
The Client completed the construction of its new Distillery in Baltimore, MD in April 2017. TAI provided the complete Project Management, Electrical, Instrumentation, Automation, and
TAI provided professional engineering services including the construction of a two story, approximately 40’ x 65’, mechanical building suitable for storage and for future uses
The Client needed construction permit drawings for design of a new amphitheater to include ventilation and electrical needs that included a field survey of existing
TAI provided the development of an Electrical, Instrumentation and Control System installation drawing package for the Client’s new mixer for batch production of several types
TAI provided design engineering for installation of outdoor Urea Storage Tank foundations, chemical containment, and integration of the Advanced Combustion Technology (ACT) skid units into
The Client awarded GEA Process Engineering, Inc. this contract for the construction of a Mechanical Vapor Recompression (MVR) Crystallization System at Client’s plant in Hutchinson,
TAI provided API inspection and test services along with process engineering support to perform pressure relief scenario evaluations, tank and pressure vessel pressure rating calculations
The Client expanded their Baltimore facility for manufacturing heavy-duty lubricants for commercial and industrial use. They wanted to construct a new building to house two
TAI developed several services for the Client including preliminary engineering, automation and controls and inspection and test services and site-wide power system analysis. For the