Lab Relocation Project
The Client expanded into a new facility to accommodate projected growth in one of their core businesses. The existing facility was comprised of a warm
Project > Page 4
The Client expanded into a new facility to accommodate projected growth in one of their core businesses. The existing facility was comprised of a warm
TAI provided the design for replacement of six (6) air handling units (approx. 25-ton each) within an occupied medical office building. The air handling units
TAI is providing turnkey services and design-build solution for the replacement of outdated PLC equipment throughout the Client’s facility. TAI is implementing a plant-wide control
A pharmaceutical manufacturer expanded their Baltimore facility by constructing a new building to house a process suite for one of their new products. The installed
The Water Wastewater Utility upgraded the disinfection system by replacing the existing gas chlorination system with a 12.5% sodium hypochlorite (NaOCl) on-site generation system. TAI
TAI provided programming, start-up and commissioning support and detailed engineering and development of construction documents for the Tank Truck Area Pump Replacement project located at
This project included the automation of the ECF Bottling Tank Room. This included wiring additional transfer pumps into the PLCs and automating existing valves. The
This project included a processing building addition, tank farm expansion, and new in-line blending capability for the installation of Smirnoff processing capability. The project included