NBP Secure Campus Expansion
TAI worked as the mechanical and electrical consultant on the expansion of an existing 500,000 SF secure campus to over 1 million SF of secure
Government & Mission Critical
TAI worked as the mechanical and electrical consultant on the expansion of an existing 500,000 SF secure campus to over 1 million SF of secure
TAI worked as the mechanical and electrical consultant for the design and engineering of a 75,000SF tenant improvement project. The tenant occupies all three floors
TAI was called upon to provide steam decentralization engineering services. The buildings’ heating systems were removed from the steam plant and provided with a gas
The Client wanted to rehabilitate its original concession stand, built in 1932, as one of the park’s oldest and most deteriorated structures. The construction on
The Client’s project was to build a new facility to include a 1,500 sf pole barn and office trailer and needed engineering, design and documentation
The Client needed construction permit drawings for design of a new amphitheater to include ventilation and electrical needs that included a field survey of existing
The Client needed a comprehensive report to be used as a guideline to prioritize maintenance schedules for future repairs and renovation for the main dwelling
"*" indicates required fields