TAI installed new compressed air service and electric distribution; fixed exterior/interior walls with (FRP/paint/cove), installed new personnel and material entry doors and new flooring and
The Client invested more than $50 million in this now world class manufacturing operation in Relay, Maryland since 2012. Major renovations of the 60 acre
TAI provided engineering, procurement and construction for upgrading the process waste system at Client’s facility located in Frederick, MD. The Client decided to replace two
This project included the automation of the ECF Bottling Tank Room. This included wiring additional transfer pumps into the PLCs and automating existing valves. The
This project included the relocation of blending and filtering operations to a new location during a plant shutdown. The relocation included the conversion of tanks
The Client needed to be able to monitor the facilities gas flares to safely ensure their continuous operations. After finding unacceptable lead times on pre-fabricated