AHU Replacement & Controls Upgrade
TAI provided the design for replacement of six (6) air handling units (approx. 25-ton each) within an occupied medical office building. The air handling units
Electrical Engineering > Page 2
TAI provided the design for replacement of six (6) air handling units (approx. 25-ton each) within an occupied medical office building. The air handling units
This project included a processing building addition, tank farm expansion, and new in-line blending capability for the installation of Smirnoff processing capability. The project included
TAI’s Client wanted to improve efficiency by increasing their food-handling capabilities in-house at their facility located in Stuarts Draft, VA. Formerly, the Client was transporting
The Client wanted to rehabilitate its original concession stand, built in 1932, as one of the park’s oldest and most deteriorated structures. The construction on
TAI provided mechanical and electrical engineering and design for the renovation of the Teen Area on the Odenton Library in Anne Arundel County. The work
The Client’s project was to build a new facility to include a 1,500 sf pole barn and office trailer and needed engineering, design and documentation
The Client needed construction permit drawings for design of a new amphitheater to include ventilation and electrical needs that included a field survey of existing
"*" indicates required fields