Food & Beverage > Page 3
TAI completed preliminary multidiscipline engineering for development of a design build RFP package for adding a new Distillation Column (Deodorizer) and new bleach filters to
The Client owns a plant and production operation located in Chandler, OK that houses multiple production process lines that manufacture milk, iced tea, cottage cheese
TAI provided engineering and construction services to install a Buhler Blending Unit Electrical unit to increase their manufacturing ability. TAI provided design documents for sizing
The Client has been completing initial feasibility work for a capital project to develop a blending operation named the Blending Center of Excellence (BCOE), located
The Pennsylvania brewery has increased it’s brewing capacity by approximately 1.4 million barrels of beer annually with the potential for expansion to over two million
TAI completed a Short Circuit Study to calculate the balanced and unbalanced fault currents at all buses and examined, in detail, the branch fault current