The Water Wastewater Utility upgraded the disinfection system by replacing the existing gas chlorination system with a 12.5% sodium hypochlorite (NaOCl) on-site generation system. TAI
TAI provided programming, start-up and commissioning support and detailed engineering and development of construction documents for the Tank Truck Area Pump Replacement project located at
TAI’s site safety and maintenance services were deployed to surface prep, seal and coat the exterior surface of two bulk storage silos for a client
The Client’s manufacturing facility in Havre de Grace needed a roof replacement of approximately 40,000 sq ft that included four separate roof sections. The roof
TAI reviewed and analyzed the construction of a 100-gallon mixing mezzanine at the Client’s facility to determine if the placarded 150 psf uniform live load
TAI completed a design for the Client’s new cooling coil configuration and support arrangement for both 7000-gallon reactor vessel located at the Client’s Williamsport plant
For the September shutdown, TAI specifically assisted the Client with performing the internal / external inspections of plant equipment including tanks, boiler, vessels, columns, heat
TAI provided professional engineering services including the construction of a two story, approximately 40’ x 65’, mechanical building suitable for storage and for future uses