Case Study > Page 3
TAI provided engineering services to upgrade outdated plant monitoring and control systems. TAI developed a 13-step plan and installed “FactoryTalk” on the existing server cluster.
TAI provided engineering, design and construction management services for the development of construction documents and follow on construction management services required for the Dextrose Storage