About

Client: CONFIDENTIAL
Location: Laurel, MD
Completed: 2010
Value Class: <$1MM

The Client is a major ice cream and frozen snack producer which manufactures and distributes a full spectrum of ice cream and frozen products.

Project Details

CHALLENGE

The Client needed an engineering firm to oversee the entire project from design and development of construction documents to Construction Management services.

SOLUTION

The project required equipment for new processing, packaging, palletizing, and CIP capabilities compliant with a cGMP manufacturing environment as well as -20°F ice cream hardening tunnels. The facility has a large central cooling plant and the new production line had to meet FDA standards and comply with the Owners and industry standard cGMP manufacturing guidelines. A construction bid package, containing design calculations, drawings, specifications and scope of work was prepared for each area. As part of the deliverables on this project, TAI participated in review sessions at 30%, 60%, 90% and 100% of all deliverables for this new line.

TAI served as the Construction Manager including monitoring all phases of the permit process while communicating progress to the Owner. Throughout the construction phase of this project, TAI collected necessary Red Lines from the construction contractor and provided Owner with a final “as built” AutoCAD documentation for all power distribution, single line diagrams, utility distribution diagrams and PID’s for process piping, glycol, city water, process hot water, and central chemical.

RESULTS

TAI provided design and architectural building improvements, utility modifications, floor plans for new equipment, equipment rigging, evaluating costs associated with purchasing and installing equipment, and creating a schedule for implementation. A construction bid package, containing design calculations, drawings, and specifications were also prepared for each area. The TAI project team participated in contractor walk-throughs and provided the written documentation to answer technical questions throughout the bid and construction phases. Additionally, TAI served as the Construction Manager and was required to acquire all necessary construction permits.

UPDATE: TAI is currently performing an electrical motor starting analysis for the 4160V refrigeration plant and of several additional line upgrades for the Client.

Services Provided:

  • Control Panel Design & I/O Drawings
  • Piping System Design & Layout

LET’S TALK

Ready to start a project?

Contact Us