Start-Up Services
This project included a processing building addition, tank farm expansion, and new in-line blending capability for the installation of Smirnoff processing capability. The project included
This project included the relocation of blending and filtering operations to a new location during a plant shutdown. The relocation included the conversion of tanks
The Client upgraded a 25-year-old PLC control system in the Edible Oil Refinery of their Soybean Processing Plant. The project involved the replacement of three
TAI provided the development of an Electrical, Instrumentation and Control System installation drawing package for the Client’s new mixer for batch production of several types
TAI worked at this facility for two different projects. The first project’s goal was to control humidity during and after cleaning procedures as well as