Commissioning Services > Page 2
TAI provided design engineering for installation of outdoor Urea Storage Tank foundations, chemical containment, and integration of the Advanced Combustion Technology (ACT) skid units into
TAI provided the initial feasibility study and the projecting scope for expansion for the storage of high proof spirits. TAI provided design and construction for
TAI worked at this facility for two different projects. The first project’s goal was to control humidity during and after cleaning procedures as well as
The project entailed the design and construction of a plant-wide Dust Collection System with a new dust collector (DC), make-up air unit (MAU), condenser (CND),
"*" indicates required fields