TAI provided multi-discipline engineering, design, and construction services to complete the construction documentation and bid packages for a new spice manufacturing plant. TAI also provided electrical and mechanical services, construction management services, project management, 3D Scanning, Construction Bid Documentation, and Construction Administration Services.
CLIENT: CONFIDENTIAL MARKET: Food & Beverage Manufacturing LOCATION: Hampstead, MD SERVICES: • Electrical & Mechanical • Construction & Project Management • Construction Bid Documentation • Construction Administration • 3D Scanning COMPLETED: 2016 VALUE CLASS: $5MM
TAI supported a global leader in beverage alcohol from concept to start-up to upgrade key production areas and their three new high speed bottling lines; all which required a large-scale bulk storage area.
TAI provided engineering, design, procurement, construction management and commissioning. The project scope included: new receiving and bulk storage capability, new concrete containment, continuous in-line blending, automation of existing batch processing, and control system replacement.
CLIENT: CONFIDENTIAL MARKET: Food & Beverage Manufacturing LOCATION: Baltimore, MD SERVICES: • Engineering & Design • Procurement • Construction Management • Commissioning COMPLETED: 2010 VALUE CLASS: $5-10MM
Read Case Study
TAI provided design and architectural building improvements, utility modifications, floor plans for new equipment, equipment rigging, evaluating costs associated with purchasing and installing equipment, and creating a schedule for implementation. A construction bid package, containing design calculations, drawings, and specifications were also prepared for each area. The TAI project team participated in contractor walk-throughs and provided the written documentation to answer technical questions throughout the bid and construction phases. Additionally, TAI served as the Construction Manager and was required to acquire all necessary construction permits.
CLIENT: Nestle Dreyers Ice Cream MARKET: Food & Beverage Manufacturing LOCATION: Laurel, MD SERVICES: • Construction Bid Package • Construction Management & Documentation COMPLETED: 2010 VALUE CLASS: <$1MM
TAI worked with Hershey to complete the engineering assessment, preliminary engineering and cost estimations for modifications of an existing flour unloaded, storage and supply operations. These multi-plant assessments also including upgrading the present flour handling systems. TAI’s work included project definition, and evaluating several options for solving flour dust collection, leakage, and storage silo pressurization problems. TAI’s equipment design, implementation plans, and operational modifications addressed safety and operational concerns related to exposure, contamination and over pressurization in the operating and storage environments.
CLIENT: The Hershey Company MARKET: Food & Beverage Manufacturing LOCATION: Hazelton, PA SERVICES: • Project Management • Engineering & Design • Cost Estimation • Project Definition and Evaluation COMPLETED: 2017 VALUE CLASS: $1MM+