Lab & Manufacturing Facility Detailed Design

TAI provided mechanical/plumbing engineering, electrical engineering, process engineering, and commissioning for both new R&D and manufacturing facilities in Gaithersburg, MD (160,000 SF) and San Jose, CA (48,000 SF). The project scope included ISO 6 manufacturing clean rooms, ISO 7 and 8 support spaces, climate-controlled warehouse, QC and PD Laboratories, and office renovations. Engineering included custom rooftop air handling units, custom exhaust air handling units, energy recovery, N+1 water cooled chiller and hot water plants, upgraded electrical service, total 1750 KW generator backup, multiple RO/DI pure water systems, WFI generation and distribution system, clean steam generation, laboratory compressed air, vacuum, carbon dioxide, and bulk liquid nitrogen systems. #pharma