Silo Inspection & Integrity Testing
During a maintenance shut down, the Client discovered multiple problems with the deteriorating conditions of their silos at the Brunner Island Generating Station. The walls
Power Generation
During a maintenance shut down, the Client discovered multiple problems with the deteriorating conditions of their silos at the Brunner Island Generating Station. The walls
TAI provided design engineering for installation of outdoor Urea Storage Tank foundations, chemical containment, and integration of the Advanced Combustion Technology (ACT) skid units into